    fun88安装夹芯板的安装介绍!
    发布来源:http://affordabLe-Louisvuittonbags.com/  2019-10-23 10:28:18 发布人:济南坚固fun88安装

      fun88安装夹芯板的安装应在建筑装饰工程完成后以及通风,电力和技术监督人员的主要部分完成之后进行。 在安装过程中,应随时清洁切割机和其他机械零件以及安装零件和施工现场。 在按照安装顺序安装壁板之后,安装顶板。

      The installation of color steel sandwich panel shall be carried out after the completion of building decoration works and the completion of main parts of ventilation, power and technical supervision personnel. During installation, the cutter and other mechanical parts as well as installation parts and construction site shall be cleaned at any time. After installing the wall panels in accordance with the installation sequence, install the top plates.

      1,壁板安装

      1. Wall panel installation

      (1)根据fun88安装夹芯板隔板平面布置图,人流与物流的长途趋势应一致,误差应小于1.5‰。 墙角应垂直交接,房间阁楼的对角线误差应小于1‰。

      (1) according to the layout plan of color steel sandwich panel partition, the long-distance trend of people flow and logistics should be consistent, and the error should be less than 1.5 ‰. The corner of the wall shall be connected vertically, and the diagonal error of the attic of the room shall be less than 1 ‰.

      (2)按照切断标准,清洁地面,确保进料槽两边没有灰尘。 用钉子将铝合金马槽固定在地面上,间隔为0.5m。 马槽和地面应紧密相连。

      (2) clean the floor in accordance with the cut-off standard to ensure that there is no dust on both sides of the feed chute. Fix the aluminum alloy raceway on the ground with nails at an interval of 0.5m. The manger shall be closely connected with the ground.

      (3)墙板安装的垂直度用磁力线校正,偏差不应大于1‰。 为了防止面板因累积误差而倾斜和扭曲,面板之间的间隙应严格控制在2.5 mm之内,并应保持均匀。

      (3) the perpendicularity of wall panel installation shall be corrected by magnetic lines, and the deviation shall not be greater than 1 ‰. In order to prevent the panel from tilting and twisting due to the accumulated error, the gap between the panels shall be strictly controlled within 2.5mm and kept even.

      (4)当以墙板和顶板之间的连接所形成的角度安装角弧铝时,应首先进行清洁。 由墙板和顶板形成的角度用建筑密封胶密封。 阴角的塑料底座通过铝铆钉与墙顶板连接。 安装铝型材后,应将其紧紧贴在乐天堂棋牌正版上,并且不会出现波浪状间隙。

      (4) when installing angle arc aluminum at the angle formed by the connection between the wall panel and the top plate, clean it first. The angle formed by the wall panel and the top plate is sealed with building sealant. The plastic base of the internal corner is connected with the wall top plate through aluminum rivets. After the installation of the aluminum profile, it shall be tightly attached to the color steel plate without wave like gap.

      (5)开关插座的电线管由乐天堂棋牌正版安装工和电工预先埋入,电工确认开关插座的开孔尺寸和位置,由乐天堂棋牌正版安装工负责打开 洞。

      (5) the wire pipe of the switch socket shall be embedded in advance by the color steel plate installer and electrician. The electrician shall confirm the opening size and position of the switch socket, and the color steel plate installer shall be responsible for opening the hole.

    20121225085862226222.jpg

      2,顶板安装

      2. Top plate installation

      (1)在安装时,首先,根据二次设计布局,需要悬挂大梁并加强起吊点的三维构件与顶梁(如悬架和锚固件)的连接位置, 应该确定。 应该垂直进行。 车顶梁用φ10mm内钢丝膨胀螺钉固定,吊索的另一端与镀锌花环螺栓和专用的镀锌深色吊梁连接,以调节顶板的平整度。

      (1) during the installation, firstly, according to the secondary design layout, the connection position of the three-dimensional components of the girder to be suspended and the lifting point to the top beam (such as suspension and anchor) should be determined. It should be done vertically. The roof beam is fixed with φ 10 mm steel wire expansion screw, and the other end of the sling is connected with the galvanized garland bolt and the special galvanized dark color lifting beam to adjust the flatness of the roof.

      (2)屋顶安装在房间内,应进行安装。 间隙应保持在2-3mm之内。 顶面应每隔0.5m用铆钉与吊索连接一次,以使它们之间的连接牢固。

      (2) the roof shall be installed in the room. The clearance shall be kept within 2-3mm. The top surface shall be connected with sling with rivets every 0.5m to make the connection between them firm.

      (3)当屋顶的长度大于3m时,除了在宽度方向上悬挂大梁外,应加强长度方向。 特殊的C型钢加强吊梁和顶部龙骨通过燕尾螺钉连接,然后使用钢丝吊肋进行吊挂。

      (3) when the length of the roof is more than 3m, the length direction shall be strengthened except for the girder hanging in the width direction. Special C-shaped steel reinforced lifting beam and top keel are connected by dovetail screws, and then the steel wire lifting rib is used for hanging.

      (4)天花板施工完成后,应在屋顶上做好其他工作的防护,严禁在天花板上进行加工。

      (4) after the completion of ceiling construction, other work shall be protected on the roof, and processing on the ceiling is strictly prohibited.