    为了更好的防水,在彩涂板装置竣工后,用专用工具把彩涂板靠屋脊、处折3CM,约800。
    In order to better waterproofing, after the completion of the color coated plate device, the color coated plate is folded 3CM, about 800, by special tools against the roof.
    在运输到屋架上的彩涂板当天工作日没能全部装置终了,用采用搭结使其结实的固定在钢屋架上,详细施行可采用棕绳或8#铅丝将其绑扎结实,这将防止在大风天气对彩涂板的任何损伤。
    The color coated panels which are transported to the roof truss can not be completely installed on the working day. They can be firmly fixed on the steel roof truss by using tie-ups. For detailed implementation, Brown rope or 8# lead wire can be used to tie the color coated panels, which will prevent any damage to the color coated panels in windy weather.
    屋脊盖板应尽可能在顶板竣工后立刻施工,若不能立刻施工,应用塑料布将屋脊处保温材维护起来,避免阴雨天影响保温效果。
    Roof roof panels should be constructed as soon as possible after the completion of the roof. If not, the insulation material at the roof should be maintained with plastic cloth to avoid the influence of rainy weather on the insulation effect.
    屋脊盖板施工时应保证其与屋面之间,屋脊盖板之间密封牢靠。
    During the construction of roof slab, the sealing between roof slab and roof and between roof slab should be ensured.
    再吊放屋面扳至屋架上准备装置时,留意应将彩涂板的母肋局部朝向首先按装的方面,如非母肋应立刻调整过来,一定要确保一块板装置位置的正确检查其对屋脊顶天沟的垂直度,确保一切尺寸精确无误后,固定一块底板,用同样的手法装置随后的底板,一直用定位县保证彩涂板端部划一的在一条直线上。
    When hanging the roof and pulling the preparation device on the roof truss, pay attention to the main rib of the color coated panel towards the first installed aspect. If the non-main rib should be adjusted immediately, make sure that the position of the first plate device is correctly checked for its verticality to the roof gutter, ensure that all dimensions are accurate, fix the first floor, and use the same technique to fix the subsequent floor, all the time. The location county is used to ensure that the end of the color coated plate is drawn in a straight line.
    彩涂板的装置

    Apparatus of color coated sheet

    (1)垂直运输板材,确保母肋朝向装置开端的办法,装置一排固定支架与屋面附檩条固定,调整其位置,确保一张顶板位置的精确无误,固定一排固定支架。
    (1) Vertical transportation of sheet metal to ensure that the mother rib is oriented towards the beginning of the device. The first row of fixing brackets is fixed with the purlin attached to the roof, and their positions are adjusted to ensure the accuracy of the first roof position and fix the first row of fixing brackets.
    (2)将一块彩涂板,按照与天沟正交的方向,排放在已固定后的固定支架上,先将中间肋对准固定支架的弯角,用脚肋或木檩将中间肋及母肋扣和在固定支架上,并检查能否完整扣紧。
    (2) The first color-coated plate is discharged on the fixed bracket in the direction orthogonal to the gutter. First, the middle rib is aligned with the bending angle of the fixed bracket, and the middle rib and the mother rib are fastened on the fixed bracket with the foot rib or wooden purlin, and the complete fastening is checked.
    (3)将第二行固定支架扣住已装置终了的彩涂板公肋,装置在每一支架件上。
    (3) The second row of fixing bracket is fastened to the public rib of the color coated plate which has been installed at the end of each bracket.
    (4)将第二张彩涂板的母肋与第二排固定支架固定,同样从中间向两端方向紧固,用同样的办法装置以后的彩涂板,留意衔接要牢靠紧固,并随时检查屋面在天沟处成一条直线,对天沟的垂直度等位置的精确性。
    (4) Fix the mother rib of the second color coated board with the second row of fixing brackets, and fasten it from the middle to both ends. Apply the same method to install the later color coated board, pay attention to the connection to be firmly and tightly, and check the accuracy of the roof in a straight line at the trench, the verticality of the trench and other positions at any time.
    (5)在装置过程中,一直在板端用定位线保证彩涂板本身的平行度及其对天沟的垂直度。
    (5) In the process of installation, a positioning line has been used at the end of the plate to ensure the parallelism of the color coated plate itself and its perpendicularity to the gutter.
    在装置过程中以下几点要特别留意:
    In the process of installation, the following points should be paid special attention to:
    (1)作支撑用的檩条,其顶部必需在同一平面上,可按实践状况需求,运用拍打或放松的方式,调整其位置以到达这项请求,千万不能直接排击固定支架的下方来企图调整屋面的坡度或位置,将彩涂板正确的安放,能够确保其有效的扣合,相反,假如彩涂板安放时没有对正恰当,将会影响彩涂板的扣合效果,特别是接近支撑中心点局部。
    (1) Purlins used as support must be on the same plane at the top. They can be adjusted to reach this request by slapping or relaxing according to the needs of practice. They must not directly strike the lower part of the fixing bracket in an attempt to adjust the slope or position of the roof. Correct placement of the color coated panels can ensure their effective buckling. On the contrary, if the color coated panels are placed correctly, the effective buckling can be ensured. If it is not right, it will affect the buckling effect of the color coated sheet, especially near the support center.
    (2)为了防止因施工不当而使彩涂板构成扇状或散开或使屋面下缘良莠不齐,安放在彩涂板时应随时检查彩涂板能否对正恰当,随时丈量彩涂板上下两端之边缘至天沟的间隔能否相等以防止彩涂板呈现斜。
    (2) In order to prevent the color coated panels from forming fan-shaped or dispersing due to improper construction or making the lower edge of the roof uneven, it is necessary to inspect whether the color coated panels are right and proper when placed on the color coated panels, and to measure whether the distance between the upper and lower edges of the color coated panels and the gutter is equal at any time in order to prevent the color coated panels from inclining.
    (3)装置后即刻清算残留于屋面上的披水碎片,拉铆钉杆,废弃紧固件等金属碎屑,由于这些金属碎屑会惹起彩涂板的腐蚀。
    (3) Immediately after the installation, metal debris such as drape debris, rivet rod, scrap fasteners and other debris on the roof will be cleared, because these metal debris will cause the corrosion of color coated sheets.