    轻钢房是怎么建成的?
    发布来源:http://affordabLe-Louisvuittonbags.com/  2019-4-26 17:25:36 发布人:济南坚固fun88安装
    如今,在我们身板常常能够见到济南轻钢房的身影,这种房屋具有良好的稳定性,并且更加牢固,所以受到了广大消费者的喜爱,那么轻钢房时如何建成的呢?如果你对此不清楚,那么就一起来了解一下吧!
    Nowadays, we can often see the figure of Jinan light steel house in our body. This kind of house has good stability and is more solid, so it is loved by the vast number of consumers. So how to build the light steel house? If you don't know about it, then let's get to know it together.
    一步:地形考察,设计图纸
    Step 1: Topographic survey and design drawings
    因地势设计出合适的房屋图纸,充分利用自然环境和地势因素,再给客户带去舒适生活的同时又避免了资源浪费。天时地利人和,三者缺一不可,在跟客户沟通过程中,首先要了解客户的需求,结合实际情况,为客户设计出满意的轻钢结构房屋设计图纸。
    Suitable housing blueprints are designed according to the terrain, making full use of natural environment and terrain factors, and then bringing comfortable life to customers while avoiding waste of resources. In the process of communicating with customers, first of all, we should understand the needs of customers and design satisfactory light steel structure housing design drawings for customers in the light of the actual situation.
    第二步:工厂加工生产
    Step 2: Factory Processing and Production
    轻钢结构房屋设计人员设计图纸做好以后,跟公司负责人沟通交流,负责人对设计满意后,图纸就算初步确认,然后再跟客户沟通确认,客户觉得满意不需要修改了以后图纸就更终确定,然后设计人员开始深化加工文件,做好以后交由负责人确认,确认过后就开始钢结构的生产了。生产龙骨的机器都是智能化的,输入加工文件过后机器就会自动生产加工,流水线的工厂化操作,规范有序,保证了产品质量又节省了生产时间。
    After the design drawings of light steel structure housing designers are completed, they communicate with the company's principals. When the principals are satisfied with the design, the drawings are confirmed preliminarily and then communicated with customers. Customers feel satisfied that they do not need to modify the drawings, and then the final determination is made. Then the designers begin to deepen the processing documents, which are confirmed by the principals, and the confirmation will begin after that. Production of steel structures. Machines for keel production are all intelligent. After inputting processing documents, the machine will automatically produce and process. The factory operation of the pipeline is standardized and orderly, which ensures product quality and saves production time.
    第三步:打好地基
    Step three: lay a good foundation
    轻钢结构房屋的整体重要要轻于传统的砖混房屋,也就意味着轻钢结构房屋的地基,相对于传统砖混房屋所要承担的整体重量要轻一些。承担的重力少很多。同时,由于轻钢结构的特殊性,钢材的柔韧性、坚固性,轻钢结构房屋地基会比传统砖混房屋要低很多,轻钢结构房屋需要平整的水泥地基。

    The overall weight of light steel structure houses is lighter than that of traditional brick-concrete buildings, which means that the foundation of light steel structure houses is lighter than that of traditional brick-concrete buildings. It bears much less gravity. At the same time, due to the particularity of light steel structure and the flexibility and firmness of steel, the foundation of light steel structure building will be much lower than that of traditional brick-concrete building. The light steel structure building needs flat cement foundation.

    乐天堂棋牌正版,fun88安装,乐天堂老虎机

    第四步:安装地梁、地板
    Step 4: Install floor beams and floors
    安装围板时沿着基础外墙上垫层的外围钉围板,围板上的铁钉间距不得大于16英寸(406㎜)。安装地梁时应指定一角按同一方向安装, 间距16英寸(406㎜),尺寸应准确,以便安装底部阻燃泡沫。梁的正驼面朝上。梁、围板用3.5(88㎜)英寸的铁钉固定在垫层上。根据图纸尺寸在安装墙体的部位必须加梁以增加强度。安装结构地板时,板与梁,板与板接头处(如果是平面必须打胶)必须打胶(液体铁钉),胶的粗细以3英寸(76㎜)黄钉粗细为标准。(补胶:如果胶没有打成一条线,有脱节,请在脱节的旁边隔10㎜处重新打胶)。地板铁钉用2.5英寸(63㎜)黄钉,钉间距为150㎜左右,适量地增加一些3.5(88㎜)英寸黄钉。地板安装好后,要求人在上面走动时不能有响声。地板接缝处无梁衬托时,板底部必须加木板补充。外墙四周围要拉线校正平直。
    When installing the enclosure, the nail spacing should not be greater than 16 inches (406 feet) along the periphery of the cushion layer on the outer wall of the foundation. When installing the floor beam, one corner should be specified in the same direction, and the spacing should be 16 inches (406 inches). The dimensions should be accurate so as to install the bottom flame retardant foam. The camel of the beam is facing up. Beams and fences are fixed on the cushion with 3.5 (88-inch) nails. According to the size of the drawings, beams must be added to the wall to increase the strength. When installing structural floors, the joints of plates and beams, plates and plates (if plane must be glued) must be glued (liquid iron nails), and the thickness of glue should be 3 inches (76 inches) yellow nails. (Repair: If the glue does not form a line, there is a disconnection, please re-glue at 10 feet next to the disconnection. Floor nails use 2.5 inch (63 inches) yellow nails, nail spacing is about 150 inches, moderately increase some 3.5 inch (88 inches) yellow nails. After the floor is installed, people are required to walk on it without noise. When there is no beam at the floor joints, the bottom of the board must be supplemented by wooden boards. The outside wall should be straightened by drawing lines around it.
    第五步:安装水电
    Step 5: Installation of hydropower
    根据设计相关的图纸放线走电路,弹线定位标记水管电线的位置,走向要求横平竖直,然后就是开槽工作,水管排布、电管布线与穿线,更后封槽,跟平时安装水电是一样的。
    According to the design of related drawings wiring circuit, bullet line positioning mark the position of water pipe and wire, the direction requires horizontal and vertical, and then slotting work, water pipe layout, electric pipe wiring and threading, and finally sealing groove, as usual installation of hydropower is the same.
    第六步:安装外墙板
    Step 6: Installation of External Wallboard
    将一层外墙挂板安在起始板条上,紧紧地咬合。在钉槽中间安装螺钉,将外墙挂板固定。安装螺钉方法同上。在外墙挂板板端与角柱及门窗边缘形槽之间预留6毫米的距离。板端应该搭接,搭接长度大约为工厂预制槽的一半(搭接时注意当地的常年风向)为了美观,每层挂板搭接部分更少互相错开1米,这样一个搭接不会直接在另一个之上。每4或5层,应检查一下外墙挂板是否与屋檐和窗户是否保持平行,是否与其它墙面上的挂板在同一直线上。当外墙挂板被固定好以后,不要用力向上或向下推它。应该在挂板没有变形的情况下安装。不能为了使板能安放在某一位置,使板产生垂直地拉应力。也不能强行将挂板安装在距离板端小于6毫米的位置。通常,搭接的部分应远离出入口和交通频繁的位置,这样会改善安装的整体外观。
    Place the first outer wall hanging board on the starting slab and engage tightly. 在钉槽中间安装螺钉,将外墙挂板固定。 Installation screw method is the same as above. A distance of 6 mm is reserved between the end of the hanging plate of the outer wall and the corner post and the edge groove of the door and window. 板端应该搭接,搭接长度大约为工厂预制槽的一半(搭接时注意当地的常年风向)为了美观,每层挂板搭接部分更少互相错开1米,这样一个搭接不会直接在另一个之上。 Every 4 or 5 floors, it should be checked whether the external wall panel is parallel to the eaves and windows, and whether it is in line with other wall panels. When the external wall hanging plate is fixed, do not push it up or down. It should be installed without deformation of the hanging plate. It is not possible to place the plate in a certain position, so that the plate produces vertical tension stress. The hanging plate can not be forced to be installed at a position less than 6 mm away from the end of the plate. Usually, the overlapping part should be far away from the entrance and frequent traffic location, which will improve the overall appearance of the installation.