新闻中心当前位置:首页-新闻中心
    乐天堂棋牌正版房对装配地点和环境的要求!
    发布来源:http://affordabLe-Louisvuittonbags.com/  2018-12-7 13:23:41 发布人:济南坚固fun88安装
    fun88安装活动房现在很常见了,虽然重量轻,但构造全体性佳,抗震性佳,房子可多差拆装,屡差运用率高。要注意的是,在fun88安装活动房对装配地点和环境是有一定要要求的。
    Coloured steel movable room is very common now. Although it is light in weight, it has good structural integrity and seismic resistance. It can be disassembled and assembled differently and has high utilization rate. It should be noted that the assembly site and environment are required in the color steel movable room.
    1.地基的硬度:在浇注底子前,要事前测量佳地基的硬度,如有地形特殊或地基硬度相次太大,务必作特殊处理,以确保板房能顺利装配和保障装配后的质量,如何特殊处理,与技能部沟通。
    1. Foundation hardness: Before pouring the foundation, it is necessary to measure the hardness of the good foundation beforehand. If the terrain is special or the hardness of the foundation is too large, special treatment must be done to ensure the smooth assembly of the panel house and the quality after assembly. How to deal with the special treatment and communicate with the skill department?
    2.底子的程度:在底子浇注时,必定要测量佳程度,底子浇注完后,程度误次操纵在10MM以内。
    2. Degree of the base: When the base is poured, it must be measured. After the base is poured, the degree of misoperation is less than 10MM.
    3.混泥土标号:大局部尺度板房底子为C20。平常情况下内无钢筋,如有地形、地基特殊情况或板房有特殊要求,应以技能部出图为准。

    3. Mixed soil label: the floor of large-scale slab house is C20. Normally, there is no steel bar in it. If there is special terrain, foundation or slab house, the drawing of skill department should be taken as the criterion.

    乐天堂棋牌正版,fun88安装,乐天堂老虎机

    4.底子浇注时间:fun88安装活动房的底子浇注应与惯例的混泥土浇注工艺一样,不可减少工艺秩序。在底子浇注完成到板房装配之间应留有充沛时间,以确保混泥土到达必定的硬度。
    4. Foundation pouring time: Foundation pouring of color steel movable room should be the same as the conventional concrete pouring process, which can not reduce the process order. There should be plenty of time between the completion of the foundation pouring and the assembly of the slab house to ensure that the concrete reaches the required hardness.
    5.要求:为保障装配工期,装配质量和装配后整洁美观,在制造底子的同时,把室内地面也一并浇注完成,程度高度与底子一样,在板房装配完成后,在室内铺地板既方便,又整洁,也不会影响板房的质量和外观。室内地板的高度应比底子程度高度高出50MM,以确保雨水不会流入室内和地圈梁的坚实水平。
    5. Requirements: In order to guarantee the assembly time, assembly quality and neatness after assembly, while making the base, the indoor floor is poured at the same time. The height is the same as that of the base. After the assembly of the panel house, it is convenient and neat to lay the floor in the room, and it will not affect the quality and appearance of the panel house. The height of indoor floor should be 50MM higher than the base level to ensure that rainwater does not flow into the solid level of indoor and ring beams.
    只有把装配地点和环境的要求达到了,装出来的fun88安装活动房才能坚固耐用,更好的保证使用安全。
    Only by meeting the requirements of assembly site and environment, can the color steel movable room be durable and safe to use.